March 14 UPDATE


Facilities is still working on pinpointing the exact location of the steam leak and needs to excavate a second test pit just outside of the Annex at the bike parking.  Please refrain from parking bikes at this location.  The work is schedule to begin Thursday, March 14 and continue until March 21.

 test pit 2

The drive lane will be closed to through traffic, with the exception of large deliveries and emergencies. Thank you for your cooperation.

Original Outage

The north MacMillan drive lane will be closed to through traffic to repair a steam leak. Facilities needs to excavate around the area between the MacMillan Building and 200 Elm to identify and repair the leak. Steam service may be interrupted to accommodate the repair.

All vehicular traffic will be required to enter via the south MacMillan drive lane. Public Safety and cart parking will be accessible from the west side entrance only. Please refer to the image below for excavation area. 

We appreciate your patience and cooperation.   

Categories:
  • Road closure
Outage type: 
Scheduled
Outage period: 
7:00am Thursday, Mar. 14, 2019 to 5:00pm Thursday, Mar. 21, 2019
Affected locations:
  • North MacMillan drive lane

Contact info